As well as maintaining and enhancing highways, footways and related structures, Marlborough Highways collaborate with Newham Council to champion greener ways of working, supporting the borough’s long-term sustainability ambitions.
This Highways Works Contract is also an opportunity to invest in the local community — creating roles for local people, improving access to apprenticeships, engaging schools and colleges across the borough, and backing initiatives that help inspire future highways careers.
Contract Dates: Feb 2026 – Feb 2030 (extendable by up to two years)
London Borough of Newham
The London Borough of Newham is one of the most densely populated areas in the United Kingdom, bounded by the River Lea to its west and the North Circular Road to its east. Spread over 14 square miles, the borough is home to some of the capital’s busiest roads including the A13, which links central London with east London and south Essex. In the last four decades public transport in Newham has undergone many upgrades and improvements, with the Jubilee Line, Docklands Light Railway and now Cross Rail serving the borough’s 350,000 residents, alongside a substantial bus network. In 2012 the London Borough of Newham was one six boroughs in the capital to host the Summer Olympic Games, which brought major infrastructure changes to the transport system.
“One of the things I value most is their very collaborative and transparent team culture. It makes a big difference to have a contractor that wants to work closely with us and is supportive and responsive. With Marlborough, I get a team who are attentive, work collaboratively and honestly with me and don’t lose focus on delivering first class communications and compliance.”
Carly Norris, Project Manager Operations, Hackney Council
“From the design stage, Marlborough has been fundamental in delivering the Broad Lane Square improvements scheme. During the works, not only did the team manage to keep to the programme, but they went the extra mile to ensure attention to detail and came up with innovative solutions to address issues encountered on site. My thanks on behalf of Haringey goes out to Marlborough for their dedication to deliver.”
Dana Rasheed, Project Manager, Haringey Council
“Working alongside our Term Service Contractor Marlborough Highways, we successfully completed renovations to the Crowstone Footbridge. The designs were provided by Marlborough, and the work was unique. The scheme was completed to budget and ahead of its programme duration.”
Neil Handley, Senior Engineer, Southend-on-Sea City Council
“I would like to thank you and your team for your efforts, the Marlborough crews were professional, courteous, and hard working all day and ensured the event went without a hitch. You and the team were a credit to the company, demonstrating commitment and support to the London Borough of Barking and Dagenham.”
Nick Davies, Specialist Services Manager, Barking and Dagenham Council
“I just wanted to say what a pleasure it has been to work with Marlborough Highways over the last six months. The quality of work is superb, and there has been some excellent collaboration between Milestone and Marlborough to complete, what at times, has been quite a challenging scheme. I hope to work with Marlborough on another project in the near future.”
Colin Hill, Schemes Manager, Milestone Infrastructure
“Marlborough worked with us in constructing a 1.3km cycle track. There were a number of technical difficulties to overcome, and their gifted foreman worked to propose some innovative solutions to the challenges we faced. The result is a facility that the locals are proud of, providing walkers and cyclists with alternative access to the hospital and nearby school. The scheme was a lot of hard work, but well worth it.”
Rob Venables, NEC Project Manager, Essex County Council
“Marlborough attracts people who take care and have pride in their work. Several gangs of Operatives worked tirelessly for six months to reconstruct drainage networks, lay more than 3km of high quality bespoke granite kerbs and granite channels blocks to ensure positive drainage. The technical compliance, attention to detail and level of quality finish along the entire carriageway was exceptional”.
Mark Chiverrell, Technical Director, Project Centre
“We saw huge benefits in appointing Marlborough as our full service contractor and we’re impressed – they’ve delivered consistent high quality service and superior quality control across every project. Marlborough, provide us with a ‘one-stop’ shop solution – we get the same quality of service and better control across all aspects of the project.”
Darren Bryant, Principal Engineer, Enfield Council