Case Studies

Southend-On-Sea’s Cliff Stabilisation

Overview Southend-On-Sea has seven miles of coastline, a stunning seafront and cliffs that attracts 6.4 million tourists every year. In 2013, a period of extreme rainfall caused damage to the cliff face and several public footways. Over time, this led to dangerous cliff slippage on the banks and around a large, historic sun shelter visited

View Case Study

Thistley Green Bridge

Overview Thistley Green Bridge based in Felsted, Essex had an old brick culvert which needed strengthening works. The culvert carries any excess water from the River Ter and local farmland during flooding. Works were needed to futureproof the bridge, strengthening it and continuing to provide effective drainage from stormwater runoff.

View Case Study

White Hart Lane Public Realm Improvements

Overview Marlborough, working in partnership with the London Borough of Haringey, was asked to deliver public realm improvements including the introduction of SuDS to the areas adjacent to White Hart Lane Station as well as along White Hart Lane and all the intersecting roads to High Road West.

View Case Study

Enfield Cycle Highways Scheme

Overview As part of London’s cycle revolution, in 2015 the London Borough of Enfield was awarded £42 million of funding from Transport for London, under the Mini-Holland scheme. The project involved creating new cycle highways, which included: segregated cycle tracks, a super-hub, and cycle park areas to make roads in Enfield, Edmonton, Edmonton Green and

View Case Study

Southend-On-Sea’s LED Street Lighting Scheme

Overview In 2012, Southend-On-Sea Council reviewed their community lighting strategy and concluded that LED street lighting would provide residents with a more effective and sustainable solution. They went on to win £13.5m funding to install over 14,400 new LED streetlights in 95% of the borough, as part of a ‘Save to Invest’ scheme.

View Case Study

Royal Hospital Chelsea Carriageway & Drainage

Overview The Royal Hospital Chelsea is a retirement and nursing home for 300 retired British soldiers. The South Grounds of the hospital not only provide a tranquil sanctuary for the Chelsea Pensioners, but host the prestigious Chelsea Flower Show, attracting more than 157,000 visitors every May. By 2014, there were two issues affecting use and

View Case Study

Barking Market Square Paving

Overview Marlborough has been the London Borough of Barking and Dagenham’s principal Term Maintenance Contractor since 2011. In 2012 they started the 1st phase of a £5million, 3-year urban regeneration program. The program involved constructing a new architecturally designed thoroughfare, installing 1,000m2+ of new paving, street lighting and drainage and planting an array of trees

View Case Study