Marlborough Highways works in partnership with Islington Council on all aspects of highway infrastructure, from maintenance services and reactive works to public realms improvements and ‘greening’ initiatives.
Working in line with the Council’s Transport Strategy, we help create a greener, cleaner and safer borough. Social value sits at the heart of our approach, allowing us to engage local communities and create opportunities for residents.
Works in the London Borough of Islington include:
Carriageway resurfacing
Footway reconditioning
Inspections, repairs and replacements to highways structures
Drainage schemes
Tree cutting maintenance, removal and emergency response
The London Borough of Islington was formed in 1965 with the merger of the metropolitan boroughs of Islington and Finsbury. One of the smallest borough’s in the country by area, it is also one of the most densely populated, with the south forming part of Central London. Home to the Emirates Stadium, Islington is also rich in cultural attractions and has a bustling night-time scene. An extensive transport network serves the borough’s 242,000 residents, with ten London Underground stations across seven lines, five London Overground stations, and six National Rail stations. The vital A1 runs centrally through Islington and includes Upper Street and Holloway Road, while the borough’s A501 and A503 roads are some of the busiest in the capital.
“One of the things I value most is their very collaborative and transparent team culture. It makes a big difference to have a contractor that wants to work closely with us and is supportive and responsive. With Marlborough, I get a team who are attentive, work collaboratively and honestly with me and don’t lose focus on delivering first class communications and compliance.”
Carly Norris, Project Manager Operations, Hackney Council
“From the design stage, Marlborough has been fundamental in delivering the Broad Lane Square improvements scheme. During the works, not only did the team manage to keep to the programme, but they went the extra mile to ensure attention to detail and came up with innovative solutions to address issues encountered on site. My thanks on behalf of Haringey goes out to Marlborough for their dedication to deliver.”
Dana Rasheed, Project Manager, Haringey Council
“Working alongside our Term Service Contractor Marlborough Highways, we successfully completed renovations to the Crowstone Footbridge. The designs were provided by Marlborough, and the work was unique. The scheme was completed to budget and ahead of its programme duration.”
Neil Handley, Senior Engineer, Southend-on-Sea City Council
“I would like to thank you and your team for your efforts, the Marlborough crews were professional, courteous, and hard working all day and ensured the event went without a hitch. You and the team were a credit to the company, demonstrating commitment and support to the London Borough of Barking and Dagenham.”
Nick Davies, Specialist Services Manager, Barking and Dagenham Council
“I just wanted to say what a pleasure it has been to work with Marlborough Highways over the last six months. The quality of work is superb, and there has been some excellent collaboration between Milestone and Marlborough to complete, what at times, has been quite a challenging scheme. I hope to work with Marlborough on another project in the near future.”
Colin Hill, Schemes Manager, Milestone Infrastructure
“Marlborough worked with us in constructing a 1.3km cycle track. There were a number of technical difficulties to overcome, and their gifted foreman worked to propose some innovative solutions to the challenges we faced. The result is a facility that the locals are proud of, providing walkers and cyclists with alternative access to the hospital and nearby school. The scheme was a lot of hard work, but well worth it.”
Rob Venables, NEC Project Manager, Essex County Council
“Marlborough attracts people who take care and have pride in their work. Several gangs of Operatives worked tirelessly for six months to reconstruct drainage networks, lay more than 3km of high quality bespoke granite kerbs and granite channels blocks to ensure positive drainage. The technical compliance, attention to detail and level of quality finish along the entire carriageway was exceptional”.
Mark Chiverrell, Technical Director, Project Centre
“We saw huge benefits in appointing Marlborough as our full service contractor and we’re impressed – they’ve delivered consistent high quality service and superior quality control across every project. Marlborough, provide us with a ‘one-stop’ shop solution – we get the same quality of service and better control across all aspects of the project.”
Darren Bryant, Principal Engineer, Enfield Council
Please see our privacy notice for more information on how Marlborough Highways Ltd take care of your details.