Marlborough Highways undertakes high-profile project work with Brent Council, which has previously included a major footway upgrade programme across the London Borough of Brent. Marlborough are currently engaged in the Kensal Corridor Public Realm Improvement Scheme, which comprises further footways works, and a variety of highways enhancement measures.
Works in the London Borough of Brent include:
Footway excavation
Relaying of kerbs
Resurfacing pavements using either warm-mix asphalt or paving
Creation of new parking and loading bays
Tree planting
Construction of pelican crossings
Contract Overview:
Project basis
Contract duration: Ongoing
London Borough of Brent
The London Borough of Brent borders the boroughs of Harrow to the north-west, Barnet to the north-east, Camden to the east, the City of Westminster to the south-east, and the Royal Borough of Kensington and Chelsea, Hammersmith and Fulham and Ealing to the south. With a population of 330,000 spanning 16.7 square miles, the major districts are Kilburn, Willesden, Wembley and Harlesden. Brent has a mixture of residential, industrial and commercial land and includes many districts of inner-city character in the east and a more distinct suburban character in the west. Brent is home to Wembley Stadium, the country’s largest stadium by capacity, as well as other cultural landmarks including the Kiln Theatre and the Swaminarayan Temple. Like most of northwest London, Brent is served by the London Overground, National Rail and more extensively the London Underground. A total of 21 tube stations are located in borough, all served by either the Metropolitan, Jubilee, Bakerloo or Piccadilly Lines. The busiest road in the London Borough of Brent is the A406 (North Circular), connecting road users with the M1 to the north and the M4 to the south.
“One of the things I value most is their very collaborative and transparent team culture. It makes a big difference to have a contractor that wants to work closely with us and is supportive and responsive. With Marlborough, I get a team who are attentive, work collaboratively and honestly with me and don’t lose focus on delivering first class communications and compliance.”
Carly Norris, Project Manager Operations, Hackney Council
“From the design stage, Marlborough has been fundamental in delivering the Broad Lane Square improvements scheme. During the works, not only did the team manage to keep to the programme, but they went the extra mile to ensure attention to detail and came up with innovative solutions to address issues encountered on site. My thanks on behalf of Haringey goes out to Marlborough for their dedication to deliver.”
Dana Rasheed, Project Manager, Haringey Council
“Working alongside our Term Service Contractor Marlborough Highways, we successfully completed renovations to the Crowstone Footbridge. The designs were provided by Marlborough, and the work was unique. The scheme was completed to budget and ahead of its programme duration.”
Neil Handley, Senior Engineer, Southend-on-Sea City Council
“I would like to thank you and your team for your efforts, the Marlborough crews were professional, courteous, and hard working all day and ensured the event went without a hitch. You and the team were a credit to the company, demonstrating commitment and support to the London Borough of Barking and Dagenham.”
Nick Davies, Specialist Services Manager, Barking and Dagenham Council
“I just wanted to say what a pleasure it has been to work with Marlborough Highways over the last six months. The quality of work is superb, and there has been some excellent collaboration between Milestone and Marlborough to complete, what at times, has been quite a challenging scheme. I hope to work with Marlborough on another project in the near future.”
Colin Hill, Schemes Manager, Milestone Infrastructure
“Marlborough worked with us in constructing a 1.3km cycle track. There were a number of technical difficulties to overcome, and their gifted foreman worked to propose some innovative solutions to the challenges we faced. The result is a facility that the locals are proud of, providing walkers and cyclists with alternative access to the hospital and nearby school. The scheme was a lot of hard work, but well worth it.”
Rob Venables, NEC Project Manager, Essex County Council
“Marlborough attracts people who take care and have pride in their work. Several gangs of Operatives worked tirelessly for six months to reconstruct drainage networks, lay more than 3km of high quality bespoke granite kerbs and granite channels blocks to ensure positive drainage. The technical compliance, attention to detail and level of quality finish along the entire carriageway was exceptional”.
Mark Chiverrell, Technical Director, Project Centre
“We saw huge benefits in appointing Marlborough as our full service contractor and we’re impressed – they’ve delivered consistent high quality service and superior quality control across every project. Marlborough, provide us with a ‘one-stop’ shop solution – we get the same quality of service and better control across all aspects of the project.”
Darren Bryant, Principal Engineer, Enfield Council
Please see our privacy notice for more information on how Marlborough Highways Ltd take care of your details.