Working in close partnership with Barking and Dagenham Council, Marlborough Highways provides a comprehensive programme of planned and reactive maintenance across more than 430 miles of carriageways and 620 miles of footways. As a Term Maintenance Contractor, we work to maintain, enhance and improve the network — delivering an efficient service that residents, businesses and road users can rely on.
Works in the London Borough of Barking and Dagenham include:
Carriageway resurfacing and reconstruction
Footway renewal and reconstruction
Traffic engineering schemes, including cycle improvements
The London Borough of Barking and Dagenham lies nine miles to the east of central London with a population of 212,000. The south of the borough is within the London Riverside section of the Thames Gateway; an area designated as a national priority for urban regeneration. Spanning nearly 14 square miles, the borough’s three main towns are Barking, Chadwell Heath and Dagenham, with 530 hectares of land situated in the Metropolitan Green Belt. The population is served by both London Underground and National Rail lines, an extensive bus network, and two main A-roads that cross the borough; the A12 and A13. A Cycle Superhighway begins in Barking, linking the borough to Canary Wharf, the City of London and the City of Westminster via a bike freeway, most of which is segregated from other road traffic. The borough was one of six in the capital to host the 2012 Summer Olympics.
More from the London Borough of Barking and Dagenham
“One of the things I value most is their very collaborative and transparent team culture. It makes a big difference to have a contractor that wants to work closely with us and is supportive and responsive. With Marlborough, I get a team who are attentive, work collaboratively and honestly with me and don’t lose focus on delivering first class communications and compliance.”
Carly Norris, Project Manager Operations, Hackney Council
“From the design stage, Marlborough has been fundamental in delivering the Broad Lane Square improvements scheme. During the works, not only did the team manage to keep to the programme, but they went the extra mile to ensure attention to detail and came up with innovative solutions to address issues encountered on site. My thanks on behalf of Haringey goes out to Marlborough for their dedication to deliver.”
Dana Rasheed, Project Manager, Haringey Council
“Working alongside our Term Service Contractor Marlborough Highways, we successfully completed renovations to the Crowstone Footbridge. The designs were provided by Marlborough, and the work was unique. The scheme was completed to budget and ahead of its programme duration.”
Neil Handley, Senior Engineer, Southend-on-Sea City Council
“I would like to thank you and your team for your efforts, the Marlborough crews were professional, courteous, and hard working all day and ensured the event went without a hitch. You and the team were a credit to the company, demonstrating commitment and support to the London Borough of Barking and Dagenham.”
Nick Davies, Specialist Services Manager, Barking and Dagenham Council
“I just wanted to say what a pleasure it has been to work with Marlborough Highways over the last six months. The quality of work is superb, and there has been some excellent collaboration between Milestone and Marlborough to complete, what at times, has been quite a challenging scheme. I hope to work with Marlborough on another project in the near future.”
Colin Hill, Schemes Manager, Milestone Infrastructure
“Marlborough worked with us in constructing a 1.3km cycle track. There were a number of technical difficulties to overcome, and their gifted foreman worked to propose some innovative solutions to the challenges we faced. The result is a facility that the locals are proud of, providing walkers and cyclists with alternative access to the hospital and nearby school. The scheme was a lot of hard work, but well worth it.”
Rob Venables, NEC Project Manager, Essex County Council
“Marlborough attracts people who take care and have pride in their work. Several gangs of Operatives worked tirelessly for six months to reconstruct drainage networks, lay more than 3km of high quality bespoke granite kerbs and granite channels blocks to ensure positive drainage. The technical compliance, attention to detail and level of quality finish along the entire carriageway was exceptional”.
Mark Chiverrell, Technical Director, Project Centre
“We saw huge benefits in appointing Marlborough as our full service contractor and we’re impressed – they’ve delivered consistent high quality service and superior quality control across every project. Marlborough, provide us with a ‘one-stop’ shop solution – we get the same quality of service and better control across all aspects of the project.”
Darren Bryant, Principal Engineer, Enfield Council
Please see our privacy notice for more information on how Marlborough Highways Ltd take care of your details.