Eastbrook Studios is a vast £500m production complex under construction in Dagenham, which will provide state-of-the-art facilities to support the international film industry. Working in close collaboration with Be First and Barking and Dagenham Council, Marlborough Highways conducted pre-works around the site, creating the transport, drainage and utilities infrastructure needed to serve the new facility.




Ahead of the main development phase, Marlborough was commissioned with pre-construction infrastructure works by Be First, which is a Council established company that is responsible for leading and coordinating the London Borough of Barking and Dagenham’s regeneration efforts. Measures included the re-alignment of existing streets and the construction of new roads, the installation of high-tech cabling, the creation of new vehicle access points, and complex works to improve the site’s drainage. As a former industrial site, there were several challenges associated with the excavation works, with unknowns regarding the location of existing cables, piping and drainage infrastructure. Meanwhile, a disused pharmaceutical plant on the site heightened the risk of there being contaminated ground, with the potential of exposure to hazardous chemical materials.
With a scheme of this scale, came the need to work with a variety of stakeholders, including local businesses, residents, utilities companies and the multinational consortium Hackman Capital Partners, which is the Eastbrook Studios lead investor. World class infrastructure was required ahead of the construction of 12 sound stages, three acres of backlot, offices and ancillary space, with one of the primary objectives being the need to permanently divert through traffic away from the site. With this came a variety of unique challenges, with expert planning crucial to works being delivered in line with the wider project timelines, and the requirement for an innovative planning solution that would meet the needs of film production companies and local road users.
Marlborough, Be First and Barking and Dagenham Council collaborated to devise a year-long schedule of works that would deliver excellence and instil confidence in the wider project, while causing minimum disruption to the community. Expert teams were brought on site, with painstaking works carried out to map the subterranean features and the safety of the ground, before civils, surfacing and specialist ducting gangs worked collaboratively to realign, improve, and construct the required infrastructure, which included approximately 1km of new road. The works were completed to time and budget, with developers now on site, creating what will be one of Europe’s premium studios. To date, several international production companies have expressed interest in the facility, with Apple and Netflix amongst the high-profile corporations now associated with the development.
Client Be First
Date July 2021 – July 2022
Duration 1 year
Value £3.5m
Project
Team
Community benefits
Quotes
“This was a very challenging project given the history and former usage of the site and limited service information. Marlborough Highways were instrumental in problem solving and ensuring that the works were completed on time, on budget and to a high standard”
Rob Wybrow, Construction Manager Civils and Infrastructure, Be First
“Dagenham used to be famous for factories and Fords. In the future, we will be equally famous for making films. It’s about bringing in thousands of jobs, providing education and training opportunities for local young people.”