Home / Case Studies / Admirals Park Bridge Improvements
Admirals Park is a section of one of the most popular cycle routes in Chelmsford. The park sees a high footfall throughout the year due to the path providing an off-carriageway connection to the west side of the city centre. Improvements were needed to increase the standard of the cycle route encourages greater use of the network and ensures the safety of those that use it. The project entailed the replacement of the run-down bride in Admirals Park with a wider and safer structure, improving journeys for both pedestrians and cyclists.






As the bridge lies in one of the most used cycle routes in Chelmsford, it was essential that the public could still access this route throughout the improvement works. The conditions of the site meant that the removal of the existing bridge and replacement of the new bridge would take precise planning and management to ensure the safety of Marlborough staff and the public. The Covid-19 social distancing rules made the developments of the site significantly more difficult and required increased communication between all parties involved to ensure government guidance was continually followed.
Client Essex Highways
Date June 2020 – October 2020
Duration 5 months
Value Part of a £15 million Chelmsford City Growth Package
Project
Client savings
Quote from client
“Marlborough were an incredibly proactive and helpful contractor who provided an exemplar service. They completed the scheme to budget and programme (with the exception of a couple of external uncontrollable factors). I would be very happy to appoint them again on future schemes.”
Kris Corbett, Project Sponsor (Highways), Essex County Council.
A new, temporary bridge was installed for the public which was open for the duration of the project- only being closed temporarily to protect the public when necessary. Marlborough’s 25 years’ civil engineering experience enabled the safe removal of the run-down bridge to allow the team to start works on the construction of new abutments.
The new 3.5 metre wide bridge was fabricated off-site and was transported to Admirals park to be lifted into its final location. Following the completion of the new bridge installation, the temporary bridge was removed, and the grounds instated. All those involved adopted the latest official advice from Gov.UK, PHE and HSE safe operating procedures in relation to the Covid-19 pandemic, and the health and safety of staff and the public was closely monitored to ensure Marlborough Highways follow government advice and guidelines at all times.