Home / Case Studies / Broomfield Cycleway Scheme
Marlborough Highways worked in partnership with Essex County Council to develop the first section of the Great Waltham to Chelmsford City Centre Cycleway between Broomfield Hospital and Goulton Road as part of the Eastern Highways Alliance (EHA) Framework. The 1.3km path was built using pioneering construction materials, and links the hospital with Chelmer Valley High School, giving cyclists and walkers a safe and attractive route that also connects to the surrounding residential areas.





The Great Waltham to Chelmsford City Centre Cycleway scheme is a 7km cycle route, that when completed, will connect key residential areas to Broomfield Hospital, schools, recreational areas, and Chelmsford City Centre. Combining new paths and improvements to existing cycleways, the route provides an alternative to driving, encouraging people to use their bikes for commuter and leisure trips away from the busy and congested B1008 Main Road. The project is split into four construction sections, the first of which was funded by the South East Local Enterprise Partnership (SELEP). The scheme was delivered via the Eastern Highways Alliance (EHA) Framework, which is a collaboration between local authorities in the East of England, with the remit of reducing project costs and timeframes, by providing an efficient and effective way to procure highways investment.
Marlborough was commissioned with managing the first phase of the scheme in partnership with Essex County Council, to create a new, off-road facility from Goulton Road to Broomfield Hospital. Designed for cycling and walking, the planned route encompassed a mixture of agricultural land and included existing footpaths, with the needs of Chelmer Valley High School pupils and the patients and employees of the hospital taken into consideration. Drainage challenges were addressed during the planning stage, and long-lasting materials were required to complete the surfacing to the required high standard. The path needed to be attractive and well-lit, with access to residential areas, the school, a local church yard, and the hospital needing to be maintained throughout the construction process.
Client Essex County Council
Date July – December 2021
Duration 5 months
Value £570,000
Project
Team
Client savings
Quote from client
“Marlborough Highways worked with us in constructing a 1.3km cycle track. There were a number of technical difficulties to overcome, and their gifted foreman worked to propose some innovative solutions to the challenges we faced. The result is a facility that the locals are proud of, providing walkers and cyclists with alternative access to the hospital and nearby school. The scheme was a lot of hard work, but well worth it”.
Rob Venables, NEC Project Manager, Essex County Council
Working closely with the ECC Project Manager, Marlborough’s expert team collaborated with the scheme’s designers, modifying the plans where necessary and recommending new construction materials that had only just come to market. Before works could begin, it was necessary to liaise with a local landowner, so that a temporary haul road could be built, allowing Marlborough’s vehicles on and off the site, without causing traffic disruption. Then, during the ground preparation on the agricultural land, complex drainage works were carried out, ensuring that the new cycleway would remain robust for many years to come.
There was a need to build several retaining walls where the cycleway ran next to a ditch, to prevent the newly built track from subsiding into it. A soft surfacing material with a high recycled rubber content was chosen for the final finish, making the path both sustainable and supple. Meanwhile, contemporary signage and stylish solar powered lighting was installed, including ground solar studs, giving cyclists and walkers a safe, eco-friendly, and well-lit route. Throughout the process, which included the creation of new crossing points at Chelmer Valley High School, Marlborough’s operatives worked tirelessly to maintain vital public access to the hospital, the school, and the church.