Home / Case Studies / Papworth Everard Cycleway Scheme
Papworth Everard is a large historic village in south Cambridgeshire, with substantial light industry and a bustling community. To the south-east is neighbouring Cambourne, a new and rapidly growing settlement, comprising three villages close to Bourn Airfield. In partnership with Milestone Infrastructure, Cambridgeshire County Council and National Highways, Marlborough Highways project managed the construction of a new equestrian, foot, and cycleway scheme, linking both communities with a designated route.





The beautiful Cambridgeshire countryside in and around Papworth Everard has long been popular with walkers, cyclists, and horse riders. As nearby Cambourne has grown rapidly since the 1990’s, calls for an attractive and safe equestrian, foot and cycleway linking the two areas have been growing louder. Funded by Cambridgeshire County Council and National Highways, the long-awaited designs for such a scheme were given approval in 2021 and after a competitive bid process, the council’s contractors, Milestone Infrastructure, selected Marlborough Highways to fully project manage the works.
The scheme involved working to a strict timeframe, and disruption to residents and local businesses had to be kept to a minimum. Sustainable working practices were required throughout, and the completed project had to complement the natural environment, both with the materials used and in the aesthetic look. The new two-way cycleway needed to be set back from the busy A1198 carriageway by at least half a metre to improve user safety, and the path had to be no less than 2.5 metres wide at any point. There was a requirement to install new fibre optic ducting throughout the length of the path, and sections of contaminated ground had to be considered during construction. Works would also need to be made to three existing culverts during the process, ensuring that good drainage could be maintained, and that the integrity of the pathway would remain robust for many years to come.
Liaising closely with Milestone Infrastructure and Cambridgeshire County Council throughout, the highly skilled Marlborough team implemented, and where necessary, adjusted the scheme designs, to ensure that the project was completed in a cost-effective and timely manner.
A lane closure on the A1198 carriageway was required so that works could be carried out safely. Marlborough worked with local stakeholders to ensure that traffic disruption was kept to a minimum, with site vehicles brought in and out during quieter periods, allowing for the ongoing flow of commuter traffic even during busier hours. What’s more, specialist light-weight machinery was used when installing the asphalt, meaning fewer lorries were needed on site.
During works to the culverts, new parapets and wingwalls had to be installed and there was the need for some steel reinforcement. Meanwhile, the contaminated ground on the site of a former carriageway was quickly cleared and the offensive material was disposed of in an environmentally friendly manner.
The new equestrian, foot, and cycleway, which is 3.5 metres wide, is now proving hugely popular with the residents of Papworth Everard and Cambourne. The project was completed to time, to budget and to the highest standards, with the works causing minimum disruption to the community and to the natural environment.
Client Milestone Infrastructure
Date October 2021 – April 2022
Duration 6 months
Value £750,000
Project
Team
Client savings
Quote from client
“I just wanted to say what a pleasure it has been to work with Marlborough over the last six months. The quality of work is superb, and there has been some excellent collaboration between Milestone and Marlborough to complete, what at times, has been quite a challenging scheme. I hope to work with Marlborough on another project in the near future.”
Colin Hill, Schemes Manager, Milestone Infrastructure