Home / Case Studies / East Beach Car Park
Marlborough Highways was tasked with carrying out major renovations to East Beach Car Park in the suburb of Shoeburyness on the Essex Coast. The scheme was the latest in a series of car park improvement projects to be commissioned by Southend-on-Sea City Council and to be carried out by Marlborough, the organisation’s long-term highways contractor. Sustainability and accessibility were central to the new design, which would benefit beachgoers and rail commuters using the nearby Shoeburyness Station.



East Beach Car Park serves the residents of Shoeburyness, including those who commute into London from the nearby railway station. The facility is also used by day-trippers and tourists wanting to visit the picturesque beach, with demand for parking higher during the warmer months. Overtime, East Beach Car Park became dilapidated, with an un-even surface, tired lighting, and poor pedestrian access deterring people from using it. As part of Southend-on-Sea City Council’s ambitious urban regeneration plans, East Beach Car Park was the latest such location to be identified for renovation works, following successful schemes in partnership with Marlborough elsewhere in the authority, including at Southchurch Park East in 2020.
Southend-on-Sea City Council commissioned Marlborough with the planning and implementation of a full redevelopment project at the site, as part of a wider rejuvenation programme of the beach area, which would include a toilet block refurbishment and a push to encourage the opening of new cafés and shops. The improved car park needed to be safe, well lit, accessible, and constructed with environmentally friendly materials. And given the proximity to the sea, designs needed to take into account the risk of flooding and the severe weather conditions which can occur there during the winter. In line with the Council’s commitment to become a carbon neutral city by 2030, the facility also had to be future proofed, with infrastructure for electric vehicle charging points required, and an energy efficient power source needed for the new lighting and CCTV system.
Marlborough presented Southend-on-Sea City Council with innovative redevelopment plans, comprising 224 car parking spaces, including 11 disabled bays, and an area to accommodate up to three coaches. The scheme, which matched the area footprint of the original site, encompassed two key phases of construction scheduled for spring and summer 2022, with the project needing to be completed ahead of the popular East Beach Reggae Festival in mid-August. A permeability test in advance of the works revealed the need to introduce a sustainable drainage system, with designs incorporating strategically placed swale features and shingle running the whole length of the car park.
Phase one of the scheme saw the construction of spacious and well-positioned foot and cycleways in and around the site, as well as the creation of a nearby temporary car park to give train passengers and beachgoers continued access to the area during works. Excavations then took place with the use of lightweight equipment, meaning disruption to pedestrians and road users was kept to a minimum. During phase two, ground and kerb works were carried out quickly and efficiently with the use of specialist low-carbon asphalt and a pioneering ExcelEdge aluminium material, resulting in a durable and robust new surface. The skills and expertise of Marlborough’s in-house electricians were essential when installing ducting for future EV charging points, and when fitting 40 stylish LED lighting columns, each with its own solar and wind power generator. Throughout the process Marlborough’s local team based at its nearby Rochford depot liaised with members of the public, providing regular project updates with a friendly and reassuring presence.
Client Southend-on-Sea City Council
Date April – August 2022
Duration 4 months
Value £800,000
Project
Team
Client savings
Quote from client
“During the East Beach Car Park design and construction phase, Marlborough’s team were very flexible. The successful implementation of the scheme has provided Southend-on-Sea City Council, residents and visitors with a first-class facility, offering better access to our award-winning coastline and local amenities.”
Martin Warren, Development Engineer, Southend-on-Sea City Council