Marlborough Highways worked in close partnership with Haringey Council to transform Down Lane Park into a more accessible, attractive and sustainable space. Forming part of the wider Tottenham Hale Regeneration Scheme, this project has equipped the park with facilities that better serve the needs of its community.






Down Lane Park is a core part of the community for tens of thousands of residents. However, due to outdated equipment the space no longer reflected the needs of the community and required significant improvement to continue being a beloved space for locals.
To address these issues, Marlborough was brought on by Haringey Council to lead this scheme and improve the footpaths, biodiversity, lighting and drainage across the park. As part of this effort, operatives also introduced a range of new facilities to the space.
Delivering this project was not without its challenges. Down Lane Park serves as a vital pedestrian connection to the nearby bus station, train station and football stadium. As such, it was important for the team to retain public access throughout the duration of works.
Additionally, as this scheme involved excavating around several thousand cubic metres of soil, it was important to responsibly manage this material in a busy part of Tottenham.
To overcome these hurdles, Marlborough carried out the Down Lane Park Improvement Scheme over two phases.
The first stage involved widening and resurfacing paths across the north-east side of the park. Operatives also constructed a new footway that connected Park View Road and Ashley Road, further improving pedestrian accessibility and usability.
A wide range of brand-new gym equipment was installed, alongside inclusive and accessible seating. Additionally, hundreds of new trees and plants were also implemented, further improving the biodiversity of the area.
During this phase of the project, three swales were created to reduce the risk of flooding in alignment with Haringey Council’s sustainable urban regeneration strategy. This required excavating around 2,500m³ of soil, which was then tested and approved for reuse at another site in the borough by the Environment Agency via a Waste Exemption Registration.
As soon as this work was completed, phase two began. This involved introducing a new play area and footpath to the space, as well as overhauled lighting, additional shaping and further landscaping.
Client: Haringey Council
Date: January 2024 – December 2024
Duration: Phase one 29 weeks; phase two 20 weeks
Value: £2.4 million
Project:
Team:
The wide variety of work Marlborough completed on this scheme has transformed Down Lane Park into a safe, attractive and well-equipped space. Built with a firm focus on the future, the revitalised community ground continues to receive positive feedback and retain its status as a Green Flag park.
Before work began on Down Lane Park, Haringey Council engaged with the public over the course of several months. These findings not only informed the new design of the space, but also guided refinements to the scheme as works continued.
Marlborough’s team also involved the nearby Harris Primary Academy in the project, holding a dead hedge building activity where pupils got to add branches, twigs and other debris to a structure made of non-living plant material. The session was fun, informative and gave students the opportunity to learn about sustainability and the natural environment.
The habitat they created continues to serve as a home for the park’s insects, birds and small mammals.