Home / Case Studies / Chesnut Road
Chesnut Road lies at the heart of the Chesnut Estate in Tottenham Hale in the London Borough of Haringey. As part of the council’s strategic regeneration programme, Marlborough Highways was tasked with creating an attractive urban environment that would act as the primary route for pedestrians on Spurs match days, and for those attending other events at the new Tottenham Hotspur Stadium. The works included the creation of a welcoming pocket park that could be enjoyed by residents and visitors to the area.





The new Tottenham Hotspur football stadium was completed in April 2019, ahead of the 2019/20 Premier League season. The landmark £1 billion development replaced the former White Hart Lane stadium, with capacity increased from 36,000 to 62,850. The extra footfall meant added pressure on the local road and rail network and to pedestrian and cycle routes in and around the borough, including to Chesnut Road. Delivered through the Green & Open Spaces Strategy and funded by the Mayor of London’s Regeneration Fund, Haringey Council commissioned Marlborough to transform Chesnut Road from an inaccessible and unattractive thoroughfare, into a welcoming community destination with a dedicated green space.
Works had to be completed in just three months and cause minimum disruption to residents and local businesses. The centre-piece pocket park had to be a space where the community could meet and relax, and there was a need for new leisure facilities, including outdoor gym equipment, a play area, and a scooter track. The use of quality materials was required throughout to ensure both the longevity and the attractiveness of the completed scheme, while public access in and the around area had to be considered throughout, with priority given to walkers and cyclists.
Working closely with Haringey Council and in collaboration with local stakeholders, Marlborough revised and improved the Chesnut Road regeneration plans to ensure works could be carried out in a manner that complimented the surrounding environment, while delivering a quality project to time and to budget. Formal progress meetings regularly took place on-site with the client and the scheme designers, which were reinforced by day-to-day conversations at office level, that enabled a flexible response to programme amendments and to ad hoc additional requests.
Works to demolish the brick wall and fencing was quickly carried out, as was the removal of existing surface materials, with the remains disposed of in an environmentally friendly way. When soil testing revealed the existence of a reinforced concrete road base along the full length of the works site, Marlborough employed the innovative solution of incorporating some of the unexpected material into the landscaping. Improvements to the existing drainage network required complex works by highly skilled operatives, while the installation of the leisure equipment and rain gardens soon transformed the area into an attractive space. The entire project was completed ahead of the first game of the new football season, with the well-lit, welcoming Chesnut Road now enjoyed year-round by the local community.
Client Haringey Council
Date May – August 2019
Duration 14 weeks
Value £630,000
Project
Team
Client savings
Quote from client
“Marlborough completed the Chesnut Road Scheme to a high standard. The whole team worked collaboratively with us to overcome numerous unforeseen issues on site and despite these issues still delivered within the tender programme, which was vital for the Client team. Marlborough showed great attention to detail and took a very proactive approach throughout the works. The benefits of the transformation to this space are already being realised by the local and wider community. We’re delighted with the finished scheme, which is a credit to the ability of Marlborough’s team.”
Tracey McGovern, Project Manager, Haringey Council