Home / Case Studies / The Women’s Tour
The Women’s Tour is the UK’s first international road cycling stage race for women, bringing together the world’s top riders to compete in Great Britain as a part of the UCI Women’s WorldTour. The race attracts an annual roadside audience of 300,000, as well as over three million fans through TV, radio, and online platforms. The multi-stage event typically takes place over six days, encompassing some of the most scenic roads in the country, with Marianne Vos, Lizzie Deignan and Demi Vollering amongst the well-known riders to have been previously crowned the tour winner. In October 2021, Marlborough Highways was tasked with project managing the Essex leg of the Women’s Tour, in partnership with the race organisers and Southend-on-Sea City Council, with just two weeks’ notice to prepare.

The 2021 edition of the Women’s Tour took place 4 – 9 October and included a challenging 117km leg in south Essex. Setting off from East Beach in Shoebury, dozens of international competitors took part in the three-hour race, which concluded with an exciting sprint finish on the seafront at West Cliff in Southend-on-Sea. Riders were joined by support vehicles, police cars and broadcast teams, with thousands of spectators lining the route. Organisers needed a dependable and trusted traffic team, to manage more than 70 roads in and around Southend-on-Sea on the day of the event. With just two-weeks’ notice, Marlborough was asked to devise and implement a complex schedule of road closures across 10km of the designated racecourse. Disruption to residents and road users had to be kept to a minimum, with the safety and wellbeing of competitors, organisers, and the public being the number one priority.
Given the short timeframes, Marlborough’s expert Traffic Management team devoted a huge amount of time and resources into developing a succinct road closure strategy, with numerous meetings and site visits conducted ahead of the race day. In the two weeks leading up to the Women’s Tour, signage was set up along the route, advising road users of the potential disruption to their journey.
Two high-spec Impact Protection Vehicles were brought to Southend-on-Sea, with multiple traffic teams deployed to different locations throughout the day, with the need to quickly and safely close roads, before reopening them at a moment’s notice, as the competitors moved on. This included temporarily diverting traffic away from the busy seafront and the major A127 and A13 routes, with operatives placed at every junction. As well as directing road users, Marlborough’s marshals needed to assist film crews, work closely with the emergency services, and act as an important point of information for members of the public. The event was hugely successful, with congestion kept to a minimum and organisers praised for the efficient running of the day.
Client Southend-on-Sea City Council
Date 8 October 2021
Duration One day event with 2 weeks planning
Value £15,000
Project
Team
Client savings
Quotes
“I just personally wanted to say thank you for everything you have provided for the Women’s Tour event and how you and your operatives stepped up today. We couldn’t have asked for more from your team.”
Spencer Thatcher-Gray, Service Manager, Southend-on-Sea City Council
“It’s been a great race. Really well organised and great to see the crowds out. The UK has put on a good show and the weather’s behaved itself!”
Sophie Wright, Women’s Tour competitor
