Home / Case Studies / Southend-On-Sea’s Cliff Stabilisation
Southend-On-Sea’s cliff stabilisation project helped to ensure Southend’s seven miles of coastline were future proof. Southend has a stunning seafront and cliffs that attracts 6.4 million tourists every year. In 2013, a period of extreme rainfall caused damage to the cliff face and several public footways. Over time, this led to dangerous cliff slippage on the banks and around a large, historic sun shelter visited by many tourists.
Read more about Marlborough’s work for Southend here.

The Council needed to find a permanent engineering and drainage solution for the cliff slippage, and install a set of pre-cast steps cut into the bank. The project presented many operational and logistical challenges including; physical and time restricted site access as the restaurant next to the site was open 6 days a week, pre-planning and managing staggered work schedules in addition to heavy 3rd party co-ordination. Unexpected mechanical engineering challenges meant project delays 24 weeks after starting
Client Southend-on-Sea City Council
Date December 2014 – August 2015
Duration 9 months
Value £1.15 million
Project
Client savings
Marlborough came up with a practical, innovative design solution to accommodate the challenging site conditions and working environment.
“Once the cliff stabilisation project got underway there were a few unexpected challenges that required revisiting structural plans, coordinating material sourcing, supply and fit very quickly. Our Project Manager, took a proactive lead, improvised and didn’t sit back.” Richard Atkins, Sea Defence Engineer, Southend-on-Sea City Council